Bathroom Roof Beam Casting is Done Slowly

in WORLD OF XPILAR27 days ago

IMG_20240514_171018.jpg


Bathroom Roof Beam Casting is Done Slowly
(WOX COFFEE SHOP and PC REPAIR)


Tonight, I want to show you the achievement of casting the bathroom roof beams done slowly, because previously I had 4 sacks of cement remaining, and this work continues to be carried out slowly, because considering the remaining unused cement, it doesn't harden when stored, so , I came to the conclusion, to do the next casting, on the bathroom roof beam.

This implementation was carried out from the left side first, because I lacked wooden boards, so, to be more economical, I used used boards. leftovers from making previous blocks.

The casting of roof beams that I mean is as shown in the picture below:


Roof Beam Casting


IMG_20240514_171018.jpg


Roof Beam Casting and Description


So, in the section below, the implementation will follow from the numbers I have given in the picture, if section number one has been completed, then work will continue with section number two.


IMG_20240513_181348.jpg


in the picture below, because the single beam pillar has not been completed, in the future additional planks will be made, which are rectangular in shape, so that we can continue with the construction of the upper single beam, in part number two.

In part number one, you also need a strong bond between the iron and steel beams attached to the roof beam.


IMG_20240513_181042.jpg

IMG_20240513_181407.jpg


Overall Cement Board Installation


Below, you Steam users, can see the entire process of casting the top beam, in the bathroom section, let's see it below:


IMG_20240514_170009.jpg

IMG_20240514_170023.jpg

IMG_20240514_170040.jpg

IMG_20240513_181341.jpg


Dismantling of Used Cement Casting Boards


and below is an example of dismantling the remaining boards used from casting, so that costs are a little more economical, so, as can be seen, I will use these used boards again, to support the casting of the upper beam, in the main part of the shop building.


IMG_20240513_181401.jpg


Sand Material is Out of Stock


Below, I would like to say that the sand material has run out, and I am forced to use the remaining sand left over from the initial construction 1.5 years ago, even though the quality has decreased because it has been mixed with soil and wild plants. However, I still use it to mix cement and sand. Hopefully this sand can be used to continue casting the upper beam.


IMG_20240514_171224.jpg

IMG_20240514_171230.jpg


That's what I can say, even though the materials as of today have completely run out, so, while saving the proceeds from the payment in my future posts, I will buy some additional materials, which are no longer available.

Hopefully all of you Steem users who have supported this development can find out about development developments in the next post.

I would like to say a thousand thanks to all Steem users, who have helped vote on each of my posts, I hope you are all always in good health at home with your family,

Regards
@sultan-aceh


INFORMATION COMMUNITY


PROMOTION STEEM
MAKE YOUR OWN VIDEO ABOUT STEEM