Effects of dry concrete casting

Hello friends, this is my first Post on this page.
Previously I talked about setting out a building, equally talked about the challenges on the site. Though that was on newcomers community, I wrote that before I subscribed steem construction.
As we all can clearly see from the first picture shows casting/blending (9inch thickness) on floor already, comes with the mat placement of 8mm reinforcement bar.
basket (y12 steel bar) was place above mat and a piller was placed, plumbed, well aligned, center fiter with a 9inch block before the casting took place.

IMG_20220906_104651_271.jpg

I couldn't hold a chance grabbing a picture of the aggregate after the mixtures.
But as it stands, talking from the above picture it still shows that we still have a wholesome water on the excavations so that made us consider going for a dry concrete casting to absorb the water and set properly.

IMG_20220906_143430_114.jpg

Thirdly, you can see below how solid the casting was, and that was after the installation of the pillers, how straight they are and how neat the work was.

What a sweet way of handling issues at site and the issues was handled peacefully.
Thank God for that.

IMG_20220906_173813_808.jpg

Comments are highly recommend on the comment box, let's hear from you friends.

Sort:  

Hello friend!
I'm @steem.history, who is steem witness.
Thank you for witnessvoting for me.
image.png
please click it!
image.png
(Go to https://steemit.com/~witnesses and type fbslo at the bottom of the page)

Coin Marketplace

STEEM 0.27
TRX 0.13
JST 0.032
BTC 61830.32
ETH 2914.09
USDT 1.00
SBD 3.62